HomeServicesSpooling
Inspection & Certification

Spooling

Wire Rope & Synthetic Line Installation and Removal

Wire rope and synthetic line installation and removal services for winches and cranes.

Spooling

Overview

RIGGING TECH's Spooling service covers wire rope and synthetic line installation and removal on offshore winches and cranes. Proper spooling is critical to rope service life and operational safety, requiring specialized equipment and qualified personnel.

Our team uses hydraulic tensioners and state-of-the-art spooling equipment to ensure ropes are installed with correct tension and proper layering, preventing premature damage and operational failures.

Our Process

01

Planning

Review of rope and winch/crane specifications.

02

Preparation

Spooling equipment mobilization and winch verification.

03

Removal (if applicable)

Controlled removal of existing rope.

04

Installation

New rope installation with controlled tensioning.

05

Verification

Spooling, tension, and installed rope condition verification.

06

Documentation

Operation record with tension data and rope condition.

Key Features

  • Wire rope installation on winches and cranes
  • Synthetic line installation (HMPE, polyester)
  • Used rope removal and proper disposal
  • Controlled tensioning with hydraulic equipment
  • Spooling and layer verification
  • Rope inspection during installation
  • Complete operation documentation

Benefits

  • Proper installation maximizes rope service life
  • Prevents premature damage from improper spooling
  • Specialized equipment ensures correct tension
  • Qualified personnel reduces incident risk
  • Complete documentation for traceability

Standards & Certifications

ISO 4309API RP 2DManufacturer SpecificationsClient Requirements

Ready to Get Started?

Contact our team to discuss your requirements and receive a tailored proposal.

Contact Us